Today we will introduce the standard operating procedures for colloid mills

Today we will introduce the standard operating procedures for colloid mills

07-09-2026

Split type circulating grinderI、Check before startup

Check the appearance of the equipment, pipelines, valves, cooling system, and materials that need to be ground.

Check for loose or damaged parts of the entire machine's components; Confirm that the inlet and outlet are open and closed smoothly, and that the circulation pipeline is connected properly without leakage; Connect the cooling water, confirm smooth circulation, normal water pressure, normal mechanical seal cooling, and prevent excessive temperature during grinding; The grinding material should be filtered in advance, and it is strictly prohibited for stones, metal shavings, hard glass blocks, and large impurities to enter the grinding chamber to avoid damaging the moving fixed grinding disc.High speed grinding colloid mill

II、 Adjustment of grinding disc clearance

Adjust the gap according to the material fineness requirements:

-Coarse grinding and large particle materials: increase the gap

-Fine grinding, 60-120 mesh ultrafine powder: reduce the gap

After the gap adjustment is completed, lock the positioning handle to prevent running and uneven fineness during work.Colloid mill manufacturer

III、 Start up trial operation

1. Before powering on, ensure that all personnel stay away from the operating parts of the equipment and do not reach near the feeding port.

2. Start up first and feed later (the core principle of colloid mill is to prohibit starting with material).

3. Start the machine by tapping to confirm that the motor is turning in the correct direction, running smoothly, without any abnormal noise, and without severe vibration.

After 10-20 seconds of normal operation without load, add a small amount of water or medium to the hopper to lubricate the grinding chamber and avoid dry grinding and damaging the grinding disc.Split type circulating grinder

IV、 Normal feeding production operation

1. After the equipment runs stably without load, it should be fed uniformly and uniformly at a constant speed. It is forbidden to feed suddenly or overload at once.

2. Keep the discharge valve fully open throughout the process, ensure smooth pressure relief in the grinding chamber, and prevent leakage and spraying caused by high pressure inside the chamber.

3. If finer precision is required, circular grinding can be activated, and the material can be repeatedly refluxed and ground to ensure that the powder is fine, uniform, and free of particle residue.

High speed grinding colloid mill

Colloid mill manufacturer

Split type circulating grinder

High speed grinding colloid mill

Colloid mill manufacturer


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy